Stephanie Yanez Rodriguez
(832) 877-1962
yanezstephanie@yahoo.com
Objective: Seeking a challenging position which will allow me to utilize and grow my skills and knowledge to
become a successful tool for the organization, while maintaining the integrity of the organizations
standards.
SUMMARY OF QUALIFICATIONS
• Wide range of knowledge in Supply Chain Management- Planning/Scheduling & over 5 years of experience
• Wide knowledge in oil & gas industries; Drilling & Offshore products
• Computer Proficiency- MS Word, SAP, Excel, PowerPoint, MS Projects, Access, XA-Citirx, Primavera P6
• APICS certification- CSCP Completion Certification
• Green Belt Completion Certification- Lean Six Sigma
• Detail-Oriented & Conscientious
• Highly Organized- Multi-tasking & prioritizing skillfully manage large projects, start to finish
• Bi-Lingual communicator
PROFESSIONAL EXPERIENCE
Oceaneering- BOP Controls
Project Scheduler
March 2014- Current
· Develop integrated detail level schedule for the design, engineering, procurement, production, manufacture,
assembly, testing, installation, and commissioning of project elements to meet the project milestones.
· Maintain integrated detail level schedule for the project elements to meet the project milestones.
· Use computer software programs, including Primavera P6, Microsoft Project, Excel and others, to develop
schedule, reports, and spreadsheets to convey project status to team and customer.
· Interface with engineering, manufacturing, and project management to develop integrated schedule to
represent project status.
· Develop reports to convey areas of concern and opportunity in the schedule to meet project milestones and
objectives.
· Recommend alternate (“what-if”) execution strategies to the Project Manager and Project Team that assists
them in creating work plans that meet the Project Milestones. Provide “early warning” for project tasks that
have negative float, or are in jeopardy of missing milestones due to lack of applied resources or other factors
that push start dates or increase durations of tasks.
· Provide forecasts to the Team of near-term and long-term target dates and upcoming Milestones, and provide
detailed critical path information that will allow the Team to see the inter-relationships between the various
Work Packages and completion of key deliverables both internal and external.
· Evaluate critical paths in the project schedules and evaluate alternative schedule options to identify optimum
project strategies or resolve problems before and during execution.
· Perform probabilistic analysis of completion dates and potential alternatives. Present risk based analysis of most
likely completion and expected deviation range.
· Develop and implements plan versus actual progress curves. Report and analyze monthly deviations from plan.
· Evaluate allocation of resources and provide recommendations to maintain required progress.
Cameron (Drilling Systems Division)
Scheduler II- Planning & Scheduling
June 2012- March 2014
• Coordinates with plant manufacturing to assure timely execution of manufacturing product and services activities.
• Reviews work center loads vs. capacity and level loads the capacity for the assigned work center (i.e. moving
forward production orders and/or purchase requirements, offloading, etc).
• Reviews the production schedule and manufacturing orders to ensure that components and services are available
in a timely manner.
• Coordinates with appropriate manufacturing personnel to solve problems related to the Production Schedule, such
as material shortage status, rejection, scrap, re-work, etc. Determines root cause for non on time work order
release, OTA stats, and develops solutions and improvement plans.
•
Interfaces with multiple departments regarding status of projects, materials, and flow of the components by
leading production/planning and project management meetings. Meetings are to ensure drum utilization and the
progression of materials through the shop and to communicate developed recovery plans.
• Manages MRP exception reports with the coordination of the Master Scheduler. Communicates needed changes
to WIP and/or planned requisitions and work orders decisions with the product Planner.
• Runs shortage report using SAP COOIS & then transfer into excel running Macro to determine shortages for each
project and/or work center
• Responsible for reporting on the viability of meeting customer order due dates, specifically determining budget
risks and communicating risk to Sales, Project Management, and Operations Management
Cameron (Drilling Systems Division)
Project Planner I- Planning & Scheduling
March 2012- June 2012
• Planning and scheduling workflow for each work center and operations, according to previously established
manufacturing sequence & lead times.
•
•
Assist manufacturing engineering to correct manufacturing order router problems and manufacturing concerns for
projects assigned.
Identify shortages and expedite production/buyer
• Continuously monitor for excessive inventory level with appropriate action, i.e. move out, and cancel/reduce.
• Generate weekly/monthly reports-identifying current/projected issued, with specific details on contributing
factors, as well as providing recommendations for appropriate corrective action plan
•
Interface with multiple departments regarding status of materials and flow of the components
• Reviews production schedule and manufacturing orders to ensure components are available on a timely manner
Cameron (formerly LeTourneau Technologies)
July 2011-March 2012
Project Coordinator -Project Management
• Continually monitors, revises and ensures resources are deployed to achieve the project plan.
• Generates/assists in the customer progress reports on a biweekly basis as required by the customer and/or Project
Manager.
• Continually monitors the plan, identifies critical items and activities having impact on the project schedule, which
require special attention and take action to resolve.
•
Incorporated updates in the project schedule based on input from the team, such as actualizing activities that have
started or delayed
• Created and ran filters to run reports to show critical paths
• Some exposure to linking activities that were not linked properly
• Works closely with the project manager to help expedite internal functional groups to meet project
objectives/deadlines.
• Works closely with customer, third party inspectors for coordinating major witness activities for FAT, etc.
• Updated phases of projects in primavera
• Helps project manager with creation of external variation orders.
• Ensure the creation and maintenance of master document and all documents were submitted on time and received
from customers with comments or approval in a timely manner.
• Works closely with engineering groups and manufacturing to meet project objectives, identify areas of concern and
work recovery plans with the project manager.
LeTourneau Technologies
Engineering Documentation Coordinator
• Controls the movement of technical documents between engineering and the client, as well as other external
parties
• Process incoming & outgoing customer transmittals; keeping physical & systematical copies up to date
• Supported engineers in updating all as built & red line drawings, keeping physical & systematical copies up to date
• Make phone calls to raw material vendors to request raw material documentation & other needed documents
when required.
• Work with projects team to insure all proper documentation was delivered & processed on time based on
customer requirements.
• Support engineering department with other duties as assigned.
Valco Instrument Co. Inc., Houston, TX
Production Planner/Scheduler
• Data entry with production integration of Styline and SAP
• Planning for multiple sub-level components, needed to produce top-level commodities, dealing with analytical
testing
•
Structured, organized, and implemented a coherent stockroom and production process for it
• Released, planned orders to proper work centers, in order to meet scheduled delivery dates, & dealt with changing
or cancelling orders, depending on notice given by sales department, or other requirements
• Reviewed BOM-Bill of Materials, routers, & router times, to ensure most updated information was in the system
• Held production meetings on a weekly basis, reporting on the viability of meeting customer order due dates, & any
action plans if needed.
CERTIFICATIONS
CSCP Certification, Houston, TX
Received completion of Certified Supply Chain Professional Certification
Six Sigma, Green Belt Certification, Houston, TX
Green Belt Completion Certification for Cameron Drilling-Brittmoore facility
August 2010- July 2011
July 2006 - August 2009
EDUCATION
Lone Star College, Cypress, TX
General education classes-AA degree
Langham Creek High School, Houston, TX
Received High School Diploma and graduated with honors
REFERENCES
AVAILABLE UPON REQUEST